Email: techhub.eapl@gmail.com, Anuj@techhubeng.in
Landline No.: +91-1244208466
Home
(Formerly Known as TECKKONNECT)
Phone: +91 - 9818073509
Phone: +91 - 7011095327

Error message

  • Deprecated function: Return type of DatabaseStatementBase::execute($args = [], $options = []) should either be compatible with PDOStatement::execute(?array $params = null): bool, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in require_once() (line 2244 of /home2/globalli/public_html/techhubeng/includes/database/database.inc).
  • Deprecated function: Return type of DatabaseStatementEmpty::current() should either be compatible with Iterator::current(): mixed, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in require_once() (line 2346 of /home2/globalli/public_html/techhubeng/includes/database/database.inc).
  • Deprecated function: Return type of DatabaseStatementEmpty::next() should either be compatible with Iterator::next(): void, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in require_once() (line 2346 of /home2/globalli/public_html/techhubeng/includes/database/database.inc).
  • Deprecated function: Return type of DatabaseStatementEmpty::key() should either be compatible with Iterator::key(): mixed, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in require_once() (line 2346 of /home2/globalli/public_html/techhubeng/includes/database/database.inc).
  • Deprecated function: Return type of DatabaseStatementEmpty::valid() should either be compatible with Iterator::valid(): bool, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in require_once() (line 2346 of /home2/globalli/public_html/techhubeng/includes/database/database.inc).
  • Deprecated function: Return type of DatabaseStatementEmpty::rewind() should either be compatible with Iterator::rewind(): void, or the #[\ReturnTypeWillChange] attribute should be used to temporarily suppress the notice in require_once() (line 2346 of /home2/globalli/public_html/techhubeng/includes/database/database.inc).

Detail Design Engineering Services

Engineering Services

    Detail Design Engineering Projects
    Plain & Rolling Terrain
    [Brown Field Highways]

  • Detailed Engineering for Constrcution of Elevated Corridor from Kargil Chowk, Gandhi Maidaan to Science college via PMCH, Ashok Raj Path in Patna (Two lane Double decker).
    Client – Bihar Rajya Pul Nigam
    Contractor – Gawar Construction Limited
    Total Length – 41Kms
  • Detail engineering for Rectification of 2 number Black Spots - Package 4 Maheshwar (65+338 to 65+746,66+175 to 66+885) and km 70+684 to 71+310 km (Chichi Mata) i.e.1+744 Km section District Samba in the union territory of Jammu & Kashmir.
    Client – NHAI
    Contractor – CEIGALL India Pvt Ltd.
  • Assessment Report for Storm Water Drainage of work “Construction of master roads (60m wide) complete in all respect at Industrial Model Township (IMT) Kharkhoda, District- Sonipat”.
    Client – HSIDC,
    Contractor – Jeet Constrcution Pvt Ltd.
  • Detailed Engineering for Four Laning of the Project Highway from End of Pinjore bypass- Nalagarh Section (Km.4+200 to 35+395) of NH-105 (Old NH- 21A) in the State of Haryana and Himachal Pradesh on the EPC Mode.
    Client – NHAI
    Contractor – Patel Infrastructure Ltd.
  • Detail engineering Stufy for Pavement design of “Construction of Four lane Bangalore Chennai Expressway from Km 53.500 to Km 71.000 (Bangarpet to Bethamangala Section in the State of Karnataka under Bharatmala on Hybrid Annuity Mode (Phase I-Package III)).
    Client – NHAI
    Contractor – KCC Buildcon Pvt Ltd.
  • Rehabilitation & Widening work for 2‐lane/ 2‐ Lane with Paved Shoulder of Existing NH‐80 from km 70.150 to Km 121.025 of Munger‐Sultanganj‐ Bhagalpur section on EPC Mode in the State of Bihar
    Client – Mininstry of Road Trnsport & Highways (MoRTH)
    Contractor – MG Contractors Pvt Ltd.
  • Detail design Engineering consultancy for Four Laning of NH-75 from existing Km 218+500 (Village Khajuri) to existing Km 259+640 (Wyndhamganj/UP Border) in the State of Jharkhand on Hybrid Annuity mode. (Section – V)
    Client – NHAI
    Contractor – MG Costruction Pvt. Ltd.
  • Detail design engineering consultancy for Change of alignment of NH-15 (Jaisalmer-Barmer-Section) From Km. 123/410 to Km. 144/500 in view of mines area beneath NH-15 for Power Plant installation at Barmer District in the state of Rajasthan on EPC Mode.
    Client – NHAI
    Contractor – Radhakrishna Infra Developers Pvt Ltd.
  • Detail Design Engineering consultancy for Strengthening/Major maintenance work of Chhindwara Ring road (133.222 km): Chhindwara – Amarwara – Narsinghpur section (113.000km) : Chhindwara – Multai & Sonakhar – Seoni (136.877km) of NH – 347 & NH-547 in the state of Madhya Pradesh & Maharashtra on EPC Mode
    Client – NHAI
    Contractor – KRC Pvt Ltd.
  • Detailed Engineering for Four Laning of Obedullaganj to Itarsi section of NH-69 from Km 2+800 to Km 8+300 and Km 20+700 to Km 63+000 in the state of Madhya Pradesh.
    Client – NHAI
    Contractor –NKC Projects Pvt Ltd.
    Total Length – 41Kms
  • Detail engineering for construction of 4-laning of rai malikpur ( haryana / rajsthan border ) - narnaul mohindergarh - charkhi dadri - bhiwani kharak corridor, section from km. 94+600 to 125+920 of nh-148b in the state of haryana (package-iv) on epc mode ,
    Contractor –CEIGALL – Shiva Buildtech
    Total Length – 31.32 Kms
  • Detail Engineering for Construction of Two Lane Sasaram Bye Pass Road (Beda to Mokar, 0.0 to 9.0 K.M.)with Earthen Shoulder including R.O.B./Bridges over Bank of Irrigation Canal in the District of Rohtas in the State of Bihar on Engineering, Procurement & Construction(EPC) Mode
    Client – Bihar Rajya Pul Nigam
    Contractor – MG Contractor Pvt Ltd.
  • The project road starts near Jatwai Village in Bulandshahar district at Ch. 19+900 and ends at Ch. 56+020 near Dibai at the meeting point of NH 93 (Ch 120.700) and SH 13 (Ch 116.320). The total length of the project road is 36.120 Kms (Design Length).
    Client – PWD,UTTAR PRADESH
    Contractor – ATLAS construction Pvt Ltd.
    Total Length – 36.120 Kms
  • Four Laning of Takoli to Kullu section of NH-21 (Km 242+000 to Km 272+000) under NHDP-IVB on EPC Mode in the state of Himachal Pradesh (Design Length-28.690 Km)
    Client – NHAI
    Contractor – NKC Projects Pvt ltd.
    Total Length – 28.690 Km
  • Rehabilitation and upgradation for four Laning of saha to sahabad section from km.14.840 to km. 31.760 of nh-444a (total length = 16.920 km) under bharatmala pariyojana in the State of haryana.
    Contractor – M/S Shiv Buildindia Pvt. Ltd JV Kaluwala Construction Pvt. Ltd
    Total Length – 16.920 km
  • Detail Design Engineering Projects
    Plain & Rolling Terrain
    [Green Field Highways]

  • Detail Engineering for Development of Six Lane Dhanara – Hatibena Section of NH-130- CD Road from km 124+611 to km 146+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package – OD-1) (Length 21.839 km)
    Client – NHAI,
    Concessionaire – NKC Projects Pvt. Ltd.
    Total Length – 27.9 Kms
  • Detail Engineering for Development of Six Lane Karki – Kaliagura Section of NH-130-CD Road from km 226+500 to km 249+000 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode (Package – OD-4) (Length 22.500 km)
    Client – NHAI,
    Concessionaire – NKC Projects Pvt. Ltd.
    Total Length – 22.5 Kms
    Scope includes for both above mentioned projects
    Alignment Geometric Design, Pavement Option studies and Finalization of Cost effective and feasible Pavement Crust composition, Junction Design, Value Engineering Advisory services etc.
  • Detail Engineering for Development of Six Lane Kantakapalle–Sabbavaram Section of NH- 130-CD Road from km 445+100 to km 464+662 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode (Package – AP-4)
    Client – NHAI,
    Concessionaire – NKC Projects Pvt. Ltd.
    Total Length – 19.562 Kms
  • Detail Engineering for Development of Six Lane Jakkuva–Korlam Section of NH-130-CD Road from km 396+800 to km 421+100 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode (Package – AP-2)
    Client – NHAI,
    Concessionaire – NKC Projects Pvt. Ltd.
    Total Length – 24.200 Kms
    Scope includes for both above mentioned projects
    Alignment Geometric Design, Pavement Option studies and Finalization of Cost effective and feasible Pavement Crust composition, Junction Design, Value Engineering Advisory services etc.
  • Detail Engineering for Construction of four lane ring road/bypass around Srinagar city from km 0.000 to km 42.100 (phase-I) under NHDP phase VII in the Union Territory of Jammu and Kashmir under Bharatmala Pariyojana on EPC mode
    Client – NHAI, EPC
    Contractor – NKC Projects Pvt. Ltd.
    Total Length – 42.100 Kms
  • Detail Engineering for Construction of four-lane Greenfield Delhi- Amritsar-Katra Expressway from Junction with Jind- Karnal road (NH-709A) near Alewa village to Junction with Ambala-Kaithal-Hissar road (NH-152) near Kharak Pandwa village (Km 91+400 to Km 120+250) under Bharatmala Pariyojna in the state of Haryana
    Client – NHAI,
    Concessionaire – NKC Projects Pvt. Ltd.
    Total Length – 28.850 Kms
    Scope includes for both above mentioned projects
    Alignment Geometric Design, Pavement Option studies and Finalization of Cost effective and feasible Pavement Crust composition, Junction Design, Value Engineering Advisory services etc.
  • Detail Engineering for Construction of Eight Lane access-controlled expressway starting from junction with SH-152 near Matariya Vadi village and ending at junction with NH-47 near Bhamaiya village in Panchmahal district (Ch. 756+052 to 781+282) section of Delhi – Vadodara Greenfield Alignment (NH-148N) on EPC Mode under Bharatmala Pariyojana in the State of Gujarat
    Client – NHAI, EPC
    Contractor – GHV India Pvt. Ltd.
    Total Length – 25.230 Kms
    Scope includes
    Alignment Geometric Design, Structures design, Geotechnical designs, Pavement Option studies and Finalization of Cost effective and feasible Pavement Crust composition, Junction Design, Value Engineering Advisory services etc.
  • Pavement design and Option study for Construction of Four lane Bangalore Chennai Expressway from Km 53.500 to Km 71.000 (Bangarpet to Bethamangala Section in the State of Karnataka under Bharatmala on Hybrid Annuity Mode (Phase I-Package III))
    Client – NHAI,
    Concessionaire – NKC Projects Pvt. Ltd.
    Total Length – 17.500 Kms
  • Detail Engineering for Construction of four-lane Greenfield Delhi-Amritsar-Katra Expressway from Junction with Patiala-Bathinda road (NH-7) near Bhawanigarh to Junction with Ludhiana-Malerkotla road (SH- 11) near Bhogiwal village (Km 188+830 to km 225+770) on EPC mode under Bharatmala Pariyojna in the state of Punjab
    Client –NHAI, EPC
    Contractor – CEIGALL India Pvt. Ltd.
    Total Length – 36.940 Kms
    Scope includes
    Alignment Geometric Design, Structures design, Geotechnical designs, Pavement Option studies and Finalization of Cost effective and feasible Pavement Crust composition, Junction Design, Value Engineering Advisory services etc.
  • Detail Engineering for Construction of 4by6 lane Greenfield Ludhiana Rupnagar NH 205K from junction with NE5 near to Manewal Ludhiana to junction with NH205 Bheora Rupnagar including spur to Kharar with Ludhiana bypass under BMP in Punjab on HAM Pkg2 of total length 46.80
    Client –NHAI,
    Concessionaire – CEIGALL India Pvt. Ltd.
    Total Length – 46.800 Kms
  • Detail Engineering for Construction of 6 Lane access controlled Greenfield highway from Km.1.900 to Km 30.000 of Rasisar to Panchu- Rajasthan section of NH-754K as a part of Amritsar - Jamnagar Economic Corridor in the State of Rajasthan on EPC mode under Bharatmala Pariyojana (Phase-I)
    • (AJ/RD-Lot -4 ,Package-1) – Length : 27.9Kms
    • (AJ/RD-Lot -4 ,Package-2) – Length : 30 Kms
    • (AJ/RD-Lot -4 ,Package-3) – Length : 30 Kms
    • (AJ/RD-Lot -4 ,Package-5) – Length : 28 Kms
    • (AJ/RD-Lot -4 ,Package-6) - Length : 29.658 kms
    • (AJ/DRGB-Package-3) – Length : 24 Kms

    Client – NHAI, EPC
    Contractor – NKC Projects Pvt. Ltd.
    Total Length – 169.6 Kms
    Scope includes
    Alignment Geometric Design, Pavement Option studies and Finalisation of Cost effective and feasible Pavement Crust composition, Junction Design, Value Engineering Advisory servives etc.
  • DETAIL DESIGN ENGINEERING CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND PREPARATION OF DETAILED PROJECT REPORT FOR IMPROVEMENT AND UP-GRADATION FOR PACKAGE- 3 LOT 4 OF BHARATMALA ROAD PROJECT(AJ/rd-lot -4 ,package-1)
    Client – NHAI, EPC
    Contractor – Ravi infrabuitd projects pvt. Ltd.
    Total Length – 30.112 Kms
  • CONSTRUCTION OF 6-LANE ACCESS CONTROLLED GREENFIELD HIGHWAY FROM KM 35+000 TO KM 67+000 OF RAJASTHAN/GUJARAT BORDER TO SANTALPUR SECTION OF NH-754K AS A PART OF AMRITSARJAMNAGAR ECONOMIC CORRIDOR IN THE STATE OF GUJARAT ON EPC MODE UNDER BHARATMALA PARIYOJANA (PHASE-I) (AJ/RGBSPACKAGE-2)
    Client – NHAI, EPC
    Contractor – Ravi infrabuitd projects pvt. Ltd.
    Total Length – 32.000 Kms
  • Construction of Eight Lane Carriageway starting from Major bridge over Takli river near Nayagaon Jageer village to Rajasthan/MP Border (Ch. 427.300 to Ch. 452.425) section of Delhi - Vadodara Access Controlled Green field Alignment (NH-148N) under Bharatmala Pariyojana in the State of Rajasthan on EPC
    Client – NHAI, EPC
    Contractor – Dineshchandra R. Agrawal Infracon Pvt. Ltd
    Total Length – 25.125 Kms
  • Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District B - 1 (Ch. 48+520 to 71+060) section of Ahmedabad-Dholera Greenfield Alignment (NH- 751) on EPC Mode Under Bharatmala Pariyojana in the State of Gujarat
    Client – NHAI, EPC
    Contractor – GHV (India) Pvt. Ltd.
    Total Length – 22.540 Kms
  • Detail Design Engineering Projects
    Mountainous & Steep Terrain

  • Four Laning of Takoli to Kullu section of NH-21 (Km 242+000 to Km 272+000) under NHDP-IVB on EPC Mode in the state of Himachal Pradesh (Design Length-28.690 Km)
    Client – NHAI
    Contractor – NKC Projects Pvt ltd.
    Length – 28.690 Kms
  • Rehabilitation and Up-gradation of Dergaon Town to 4 laning from km. 426.800 to km 437.400 on NH-37 in the state of Assam on Engineering, Procurement & Construction (EPC) Mode
    Client – NHIDCL
    Contractor – NG Projects Pvt Ltd
  • Rehabilitation and up-gradation of road from km 46.597 to km 66.845 (Total length: 20.248 km) of Kanchanpur- Vaghmun section on NH-44A to two lane with paved shoulder in the state of Tripura on EPC basis- (package-III)
    Client – NHIDCL
    Contractor – R S BHAMBOO CONSTRUCTION PVT LTD.
    Total Length – 20.248 km
  • Rehabilitation and Up-gradation of Keifang – Rulchawm section (Economic corridor) of NH-6 from Existing Chainage Km 30+050 (Keifang) section to Km 50+360 (Rulchawm) (Design chainage Km 27+400 to Km 45+040) (Package-III) in the state of Mizoram under Bharatmala Pariyozna on EPC mode
    Client – NHIDCL
    Contractor – NG Projects Pvt Ltd
    Total Length – 17.640Km
  • Rehabilitation and up-gradation of 2 lane with paved shoulders of Keifang section (Economic corridor) from Existing km 15+000 to km 30+050 (Design chainage Km 13+510 to km 27+400) (Pakcage-II) of NH-6 in the state of Mizoram Under Bharatmala Pariyozna on EPC mode.
    Client – NHIDCL
    Contractor – NG Projects Pvt Ltd
    Total Length – 15.050 Km
  • Construction and up-gradation of existing road to 2-lane with paved shoulder of Bagrakot-Kafer section of NH-717A from km 13.000 to km 25.600 on EPC basis under SARDP-NE Phase’A’ in the State of West Bengal-Package IV B(2nd call)
    Length – 12.600KmClient – NHIDCL
    Contractor – Rani Constructions Pvt. Ltd - SSCIPL JV
    Total Length – 12.600Km
  • Construction and up gradation of existing road to 2-lane with paved shoulder including geometric improvement of Kafer to Lava More section from Km 40+000 to Km 61+100 ofNH-717A on EPC basis under SARDP-NE Phase ‘A’ in the state of West Bengal (Package-V A)
    Client – NHIDCL
    Contractor – Rani Constructions Pvt. Ltd - SSCIPL JV
    Length Length – 21.000 Km