Engineering Services
- Teckkonnect has a keen sensitive vision towards Road safety and is rigorously working towards Building “Forgiving Roads” thru its Engineering Contribution.
- Teckkonnect as an organization although has not undertaken any Road safety Consultancy work, however the Key Proffessional “Mr. Anuj Narula” has worked in Multiple assignments of Road safety audits and worked as “Road safety Engineer” as well. His CV has been used for many Road safety Assignment. Further “Mr. Anuj Narula” has completed Two Trainings of Road safery audit and other related aspects as CSIR- CRRI, the details of which are given below.
- Training program on “Road safety audit”, 20 th Aug,2012 – 23 rd Aug,2012 at CSIR – CRRI, New Delhi
- Training Program on ‘Road Safety audit and other Road safety related aspects”, 29 th April,2019 – 13 th May,2019, 15 days certification course at CSIR-CRRI, New Delhi
Further he has delivered a Seminar on “Road Safety During construction Stage” on 5 th October, 2016, in Ranchi, Jharkhand ( Acknowledged by Member technical), State Highway Authority, Jharkhand)
- Working as “Road safety Engineer” for “Balance work of Rehabilitation and Upgradation of Indo/ Nepal Border to Rudhauli section (Km 0.000 to Km 65.870) of NH-233 in the State of Uttar Pradesh”
Client – NHAI
Contractor - JSP PROJECT PVT. LTD & Vijai Construction (India) Pvt. Ltd. (JV) - Pre Safety audit Report for Rehabilitation and Upgrading to 2/4 laning of Gwalior – Dewas Section of NH 3 in the State of Madhya Pradesh
Client – NHAI
Responsibilities –Analysis of Geometric design elements from Road safety point of view, Preparation of Pre safety Audit report - Road Safety Consultant for two packages of Six Lane Amritsar Jamnagar Access Controlled Highway
- Package – 3 (LOT-02); Rasisar – Deogarh Section in Rajasthan, Length - 30 Km
- Package -3 (LOT-03); Rajasthan – Gujarat Border Section, Length – 24 Km
Client – NHAI
Contractor – NKC Project Pvt. Ltd. - Safety Audit for the Project of Surat – Dahisar Section of NH 8 (From km 263.000 to km502.000) in the State of Gujrat and Maharasthra.
Client - NHAI
Responsibilities – a) Accident study & Analysis for the Project section Safety audit for Development stage comprising Checking of Detailed design, Signage’s & Road marking drawings, Schedule of Anti crash barriers etc. with respect to Manual and IRC codes and delivering recommendations from road safety point of view Safety audit for Construction stage comprising preparation of checklist for Work Zone safety in Traffic control zone (i.e. Construction zones) & Worker’s safety, Identification of safety hazard on the site, placement of Delineators, Anti crash barriers, Pedestrian guard rail, Chevron signs, Hazard markers, Object markers etc. and recommendation to improve safety measures on construction site including proposal of additional safety measure viz. Table top speed humps, Rumble strips , Tactile edge lines etc.